Reliability test sample size and LTPD calculator
Yield, quality and reliability. Everything is calculated in your browser; nothing you enter is sent to a server.
KEY POINTS
The sample size needed to demonstrate reliability R at confidence level CL with zero failures is n = ln(1−CL)/ln(R): 230 units for 99% reliability at 90% confidence, and 2,302 units for 99.9%. The "3 lots × 77 units = 231 units with 0 failures" plan common in JEDEC HTOL testing corresponds to an LTPD of about 1% at 90% confidence.
Sample size needed to demonstrate a target reliability
Upper bound on the defect rate from test results (LTPD)
The "3 lots × 77 units = 231 units with 0 failures" plan often used for HTOL and other tests in JEDEC JESD47 corresponds to an LTPD of about 1% at 90% confidence.
Test size needed to demonstrate a failure rate (FIT) target
Failures are assumed to follow an exponential distribution (constant failure rate). Derive the acceleration factor from the test conditions (temperature, voltage, humidity) and the use conditions.
Reliability and sample size with zero failures
| Reliability R | CL 60% | CL 90% | CL 95% | CL 90%, up to 1 failure |
|---|---|---|---|---|
| 90% | 9 | 22 | 29 | 38 |
| 95% | 18 | 45 | 59 | 77 |
| 99% | 92 | 230 | 299 | 388 |
| 99.5% | 183 | 460 | 598 | 777 |
| 99.9% | 916 | 2,302 | 2,995 | 3,889 |
Zero failures does not mean 100% reliability
Even if a sample test shows zero failures, you cannot conclude that the population defect rate is zero. All you can say is that if the defect rate were p or higher, the chance of all n units passing would be no more than 1 − CL. Demonstrating 99% reliability at 90% confidence with zero failures takes 230 units, and 99.9% takes 2,302; each extra nine of reliability multiplies the sample size by roughly ten.
Semiconductor reliability qualification draws samples from at least three lots to capture lot-to-lot variation. Failure rate (FIT) claims rely on tests accelerated by temperature or voltage, converted to use conditions with an acceleration factor. A larger acceleration factor means fewer samples and shorter tests, but test conditions are capped so they do not trigger failure modes that never occur in use.
FAQ
Why 77 units per lot?
Three lots of 77 units give 231 units. With zero failures, that demonstrates an LTPD of about 1% at 90% confidence, which is why the plan appears in JEDEC JESD47 qualification.
Does zero failures prove 100% reliability?
No. It only shows that if the defect rate were above a certain level, passing every unit would have been unlikely. Each extra nine of reliability needs roughly ten times as many units.
Related equipment and companies
More calculators
Yield, quality and reliability
- All semiconductor calculators
- Process capability (Cp and Cpk) calculator
- Die per wafer (DPW) calculator
- Die yield calculator (defect density models)
- Wafer weight, area and thickness calculator
- Acceleration factor and failure rate (FIT) calculator
- Weibull analysis calculator (β, η, B-life)
- Fault coverage and shipped defect rate (DPPM) calculator
Last updated: October 23, 2026